तपाईँ सुन्दै हुनुहुन्छः

Suspension bridge construction project nears completion

Tanahu: The construction of a suspension bridge over the Sanghe Stream in Tanahu has neared completion. The bridge that connects Byas municipality-7 and Myagde rural municipality-6 in the district is likely to be readied by the end of coming June. The cost of the project is Rs 4.3 million.

Bridge construction committee chair Rekh Bahadur Thapa said the government has borne 85 per cent and the local government (Myagde rural municipality) contributed the remaining 15 per cent cost of the project.
The project kicked off on March 27 and the deadline requires making it ready by coming June 29.

The 67-meter-long structure is expected to benefit around 500 people of the related localities.

Non-government organisation coordination committee, Tanahu district branch lent counselling and technical support for the project. The locals had been demanding the construction of a bridge at the place for a long.

The lack of a bridge at the locality resulted in human casualties in the past as the locals were compelled to cross the stream.

प्रतिक्रिया राख्नुहोस्

Back to top button