{"id":427026,"date":"2026-03-25T07:09:52","date_gmt":"2026-03-25T01:24:52","guid":{"rendered":"https:\/\/radionepalonline.com\/en\/?p=427026"},"modified":"2026-03-25T07:09:56","modified_gmt":"2026-03-25T01:24:56","slug":"minister-chaulagain-inspects-progress-of-bheri-corridor-project","status":"publish","type":"post","link":"https:\/\/radionepalonline.com\/en\/2026\/03\/25\/427026.html","title":{"rendered":"Minister Chaulagain inspects progress of Bheri Corridor project"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><\/h3>\n\n\n\n<p><strong>Surkhet, March 25:<\/strong> Minister for Physical Infrastructure and Transport Madhav Prasad Chaulagain has carried out a field inspection of the Bheri Corridor road project.<\/p>\n\n\n\n<p>The minister began monitoring the road section from Pasagad in Bheri Municipality-4 of Jajarkot to Dunai, the headquarters of Dolpa. During the visit, he observed that five motorable bridges along the corridor remain incomplete.<\/p>\n\n\n\n<p>However, construction of the roadway is nearing completion, with blacktopping underway along a 56-kilometre stretch.<\/p>\n\n\n\n<p>The minister also reviewed progress on a new contract process for road construction and blacktopping from Athbiskot-5 in Rukum Paschim to Tripurasundari Municipality-1 in Dolpa.<\/p>\n\n\n\n<p>According to Chief District Officer Junu Hamal, the minister held discussions with representatives from Tripurasundari Municipality and the District Administration Office, Dolpa, regarding ongoing and upcoming works.<\/p>\n\n\n\n<p>The meeting also discussed the decision to award a contract for the construction of the Lyashikyap\u2013Sishaul section under the Bheri Corridor in upper Dolpa.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Surkhet, March 25: Minister for Physical Infrastructure and Transport Madhav Prasad Chaulagain has carried out a field inspection of the Bheri Corridor road project. The minister began monitoring the road section from Pasagad in Bheri Municipality-4 of Jajarkot to Dunai, the headquarters of Dolpa. During the visit, he observed that five motorable bridges along the &hellip;<\/p>\n","protected":false},"author":47,"featured_media":427027,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,4,5],"tags":[],"reporter":[],"class_list":["post-427026","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-english","category-en-news","category-top-stories"],"acf":[],"_links":{"self":[{"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/posts\/427026"}],"collection":[{"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/users\/47"}],"replies":[{"embeddable":true,"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/comments?post=427026"}],"version-history":[{"count":1,"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/posts\/427026\/revisions"}],"predecessor-version":[{"id":427028,"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/posts\/427026\/revisions\/427028"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/media\/427027"}],"wp:attachment":[{"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/media?parent=427026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/categories?post=427026"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/tags?post=427026"},{"taxonomy":"reporter","embeddable":true,"href":"https:\/\/radionepalonline.com\/en\/wp-json\/wp\/v2\/reporter?post=427026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}